Public ilumination

Management, technical maintenance, refurbishment and extension of major public lighting systems: Main contracts: ● Management of public lighting in Fortaleza, with more than 180,000 points of lighting. Service support to cities through 156 number. ● Contracted with CELESC – Centrais Elétricas de Santa Catarina 167,000 lighting points distributed throughout the state border. Municipalities ● Contract […]

Distribution networks

The construction and erection of distribution networks up to 34.5 kV, with supply of design and materials. Major works: CESP – Cia Energética de São Paulo CELESC – Centrais Elétricas de Santa Catarina S/A CERON – Centrais Elétricas de Rondônia S/A

Substations

Integration of projects, civil construction and electromechanical erection with the supply of equipment and materials of extra-high-voltage substations. With more than 100 substations built, adding to over 7,000 MVA. Furnas Centrais Elétricas S/A.Construction of the 13th extension of 750 kV Tijuco Preto with installed power of 1550 MVA. STN – Sistema de Transmissão Nordeste S/ATurn-key, […]

Transmission lines

Integration Projects, civil construction and electromechanical erection with the supply of equipment and materials, of transmission lines of high and extra voltage, 4.725 Km4.725 Km of totting up lines built. Major works:Furnas Centrais Elétricas S/A Eletronorte – Centrais Elétricas do Norte do Brasil S/A Sistema de Transmissão Nordeste S/A Empresa Norte de Transmissão de Energia S/A

Civil construction

DAESP – Airways Department of São Paulo StatePassenger terminal of the airport of Sorocaba (SP) Services: project elaboration and implementation of special metallic roofing; sound systems, fire systems, telematics, control command, electricity, automation, signaling, air conditioning, complete hydraulics with elevated water tank and lighting of aircraft maneuvering yard. CDHU – Urban Housing Development Company of […]

Generation

Ijuí Energia S/A – Location: Rio Ijuí/RSOccupied area: 23.4Km2Installed power: 51 MWFirm Energy: 30,1 MWh/mediumImplementation period: 2.4 years Foz do Rio Claro Energia S/A – Location: Rio Claro/GOOccupied area: 7.6 Km2Installed power: 67 MWFirm Energy: 41,5 MWh/mediumImplementation period: 2.4 years Queluz Energia S/A – Location: Rio Paraíba do Sul/SPOccupied area: 12.7 Km2Installed power: 30 MWFirm Energy: 21,4 MWh/mediumImplementation period: […]

Oil and gas

Refinaria[Refinery] Abreu Lima – RNEST CAFOR (Pernambuco)Executive design, construction and erection, testing, pre-operation and support to operation for implementation of power house, compressed air unit, entry substation, three substations and interconnecting of one to the power house. Deployment of Storage tanks; intermediaries; of derivatives; residue; chemical products, drainage of filtered water, industrial water, of demineralized water, […]

Transportation

In Transport, Alumini suggests and performs technical implementation of energy systems for trolleybus and railway networks associated with the guarantee of quality and experience in the services of electromechanical erection of contact and auxiliary systems, executive design, development and deployment of the supervision and control system, construction and maintenance of electrical systems in airport and […]